Heyuan Power Plant

The Heyuan Power Plant Project is a joint venture between a subsidiary of Hopewell Holdings and the Shenzhen Energy Group for 2 x 600 megawatts ultra-supercritical coal-fired power plant built in Heyuan City, Guangdong Province. Besides being one of the province's most efficient and environmentally friendly coal-fired power plants, it was also the first in China to be equipped with a flue gas desulphurisation wastewater treatment system.

The total investment cost of the project is about RMB4.7 billion (as per final account). Unit 1 and Unit 2 commenced operation in Jan 2009 and Aug 2009 respectively.


Key Operating Statistics FY17 FY18
Gross generation (GWh) 5,200 6,100
Utilisation rateN1 49% 58%
Availability factorN2 73% 84%
Average on-grid tariff
(with desulphurization, denitrification, dust removal and super low emission)
(excluding VAT) (RMB/MWh)
374.2N3 364.7
Approximate cost of coal (5,500 kcal/kg)
(incl. transportation cost and excl. VAT) (RMB/ton)
600 674


N1: Utilisation rate = Gross generation during the period under review / Total number of hours during the period under review X Installed capacity
N2: Availability factor = The number of hours for electricity generation during the period under review / Total number of hours during the period under review
N3: Unit 1 - without super low emission tariff during
1 Jul 2016 – 17 Jan 2017